Support icon (question mark) representing help or customer support.
Closing Date: 27 November 2026
image failed to load
Plant Engineer  Standerton
image failed to load

The ideal candidate would be responsible for:
Β 
β€’ Assist in planning, costing & execution of capital projects;
β€’ Assist in compiling of annual CAPEX & OPEX budgets;
β€’ Operational and maintenance responsibility over the following sections:Β 
Β  Β  Β  Β  Β  Β  Β οƒ˜ electrical MV equipment, generators, transformers, switch gear etc.
Β  Β  Β  Β  Β  Β  Β οƒ˜ refrigeration plants, condensers and evaporators.
Β  Β  Β  Β  Β  Β  Β οƒ˜ air compressors, receivers and blowers.
Β  Β  Β  Β  Β  Β  Β οƒ˜ water recycle and filtration plants.
Β  Β  Β  Β  Β  Β  Β οƒ˜ site services.
β€’ Optimization of Goldi PPP water and electricity systems (reduce waste and use);
β€’ Optimize use of Pragma CMMS to ensure plant reliability and artisan efficiency standards;
β€’ Daily interaction with Lekwa Municipality to ensure consistent supply of electricity and water;
β€’ Daily interaction with a large number of suppliers in an endeavor to proactively sourceΒ the most cost effective &Β  Β  Β  Β  Β quality intrinsic solutions, thereby maximizing plant output;
β€’ Implementation & maintenance of various 20 Keys projects within the Engineering department;
β€’ Daily interaction with various departmental & inter-group role players at management level;
β€’ The Maintenance Manager and Plant Engineer are expected to work closely and offer reliefΒ when either is on extended leave;
β€’ The Plant Engineer part of the succession plan to replace the Engineering Manager andΒ therefor must also deputize as department head;
β€’ GMR2.1 appointment over;
β€’ Sterilization plant. (includes steam boilers and pressure vessels);
β€’ Refrigeration plant and ammonia equipment;
β€’ Electrical MV and reticulation systems;
β€’ Water filtration plant. (includes WWTP);
β€’ Logistics;
β€’ Services;
β€’ Approve statutory inspections and ensure these are filed correctly.
Β 
The successful candidate must meet the following requirements:
Β 
β€’ Must have a technical tertiary qualification preferably in the electrical field and must beΒ in possession of a valid Government Certificate of Competence;
β€’ Installation Electrician Certification;
β€’ 10 years working experience in a Poultry Primary Processing Plant;
β€’ Ammonia Category B certification. (added advantage);
β€’ Steam Boiler Management certification. (added advantage);
β€’ Must be able to work overtime & on weekends when necessary;Β 
β€’ Ideally permanently reside within 40 km radius of the Goldi PPP.


 

Closing Date: 27 November 2026